CONSTRUCTION PROJECTS
CONSTRUCTION PROJECTS
WASHINGTON, DC
Replaced the two overhead roll-up doors with a single overhead insulated door and a single overhead speed door. Replaced the man door as a separate door independent from the overhead loading dock roll-up door and revised the curb outside the man door for the new door configuration. Repaired minor structural deficiencies to lintel above the south loading dock overhead doors and replaced bollards for new door configuration.
Industry
Commercial
Sector
Culture and Museums
Client
The Smithsonian Institution
Architect
Callison RTKL
STRUCTURAL ENGINEER
Silman
General Contractor
Autumn General Contracting, LLC
Role
Construction Management, Project Management